 |
AirPOLDER Images (quicklook)
Imagery from AirPOLDER Instrument
Animation and Quicklook of successive acquisition from POLDER.
|
|
| |
|
 |
|
| |
|
|
| |
| Scenes 2080-2150 : RGB Composite including 864 polarized channel (above) and 864nm greyscale (below) |
|
| |
|
Flight (Mission) Detail
by Bill L. Smith
Goals of Flight:
-
Accomplishments of Flight:
-
-
Location:
Weather Conditions:
Instrument Problems:
- Looks like Christian Verwaerde was able to isolate the instrument from some interferences that caused some cyclic reset of the instrument head. During the 3 hours period where the instrument worked, only one period of cyclic reset was observed. However, after 3 hours of acquistion, the head was reset 10 times and never responded. At that time the acquisition system was shutdown and never reboot.
- POLDER shutdown at 18:24 and didn't restart.
- It has been deciced that for the next flight, the instrument will be powered from the same 28V DC as the NASA pod to try to isolate POLDER as much as possible from RSP.
- At this point, Scaled doesn't recognize any problem in their electrical configuration, nor potential interference with RSP heaters.
- POLDER team will pursue investigations on potential instrument failures.
RGB QUICKLOOK
Flight Log
by Jerome Riedi based on flight card from Mike Alsbury
|
Proteus Flight Log
|
|
Time (UTC)
|
Activity
|
|
15:26:20
|
First POLDER acquisition
|
|
15:30
|
Very High thin cirrus below with BKN deck below
|
|
15:39
|
ER2 underpass : Proteus -> N --- ER2 -> S
|
15:39 15:43
|
A1 turned south
|
|
16:12
|
WB57 in left turn directly in front of Proteus
|
|
16:13
|
ER2 overpass + WB57 contrail
|
|
16:15
|
Over WGS, approximate coincidence with WB57 and ER2
|
|
16:16
|
Over WB57 contrail
|
|
16:18
|
Crossing coastline
|
|
16:40
|
Approaching top of cell
|
|
16:53
|
Over another cell
|
|
17:06
|
WB57 passes 6 miles off, right side headed north.
|
|
17:29
|
WB57 passes 6 miles off, left side headed south, Proteus headed north
|
|
17:36
|
ER2 6 miles off right wing, headed south.
|
|
17:45
|
coincidence with WB57
|
|
17:55
|
ER2 Overpass
|
|
18:14
|
ER2 overpass off right wing 6 miles
|
|
18:19
|
Lots of cirrus below
|
|
18:24:13
|
POLDER system shutdown improperly and didn't restart.
|
Level-1B FTP Data Distribution
|